Separate plant assets from a line-only sale

plant scope, utilities, buildings interface and relocation · international plant projects

Evaluate the interface between equipment, buildings and utilities. A plant project needs a complete scope for dismantling, relocation and recommissioning as well as a machine inventory.

01

Separate plant assets from a line-only sale

Map production equipment, supporting utilities and interfaces with buildings. State which assets are sold and which remain part of the original site. A plant project needs this boundary before a meaningful budget or relocation plan can be prepared.

02

Define the application

Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.

03

Compare like with like

Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.

04

Build the delivered cost

Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.