Two lines can each work on the existing cooling system and compete for it when they run together. Collect the required conditions and demand from both equipment suppliers. Compare them with observed site performance while the intended users are operating.

Record the combined cases on the same basis

When requirements are stated on the same basis, 18 kW and 12 kW occurring together make a 30 kW indicative cooling load. The plant utility specialist still needs to review coincident demand, available plant performance and other connected users. Record all assumptions and the time window.

Avoid combining numbers measured under different conditions.
ScenarioDocumented requirementVerified at site
Line A alone______
Line B alone______
Both lines at planned output______
Other concurrent loads______

For example, a supplier lists 34 kW of heat rejection for line A and 28 kW for B at stated conditions. The listed simultaneous duty is 62 kW under those same assumptions. Ask the utilities contractor to check conditions at the machines during the combined peak, including the distribution limits and any other users connected to the circuit.

Map the plant equipment and utilities included in the project

Review cooling for both bottling lines

Send equipment references, schedules and the conditions documented by each supplier.