Plan relocation of a production asset

plant scope, utilities, buildings interface and relocation · international plant projects

Evaluate the interface between equipment, buildings and utilities. A plant project needs a complete scope for dismantling, relocation and recommissioning as well as a machine inventory.

01

Plan relocation of a production asset

Sequence disconnection, dismantling and shipment around the equipment and supporting systems. Confirm access and lifting arrangements with appointed specialists. Allocate reinstatement and commissioning responsibilities for the full plant scope rather than only its most visible machines.

02

Plan before dismantling

Document layout, cable and pipe routes, reference points, software backups, alignment and the sequence needed for reassembly.

03

Protect every component

Define cleaning, preservation, labelling, packing, lifting points, transport frames and environmental protection for the journey.

04

Prepare the destination

Confirm utilities, foundations, access, safety compliance, integration, commissioning resources and acceptance criteria.