A line can sit on its own frames and still depend on plant utilities. At the first survey, mark each physical connection that crosses from the equipment included in the offer into the building or a shared production system. Ask which side of that point each party will supply and which measurements the receiving site must match.
Draw a boundary before comparing offers
| System | Trace on the seller’s drawing | Record for the receiving site |
|---|---|---|
| Product and CIP | Upstream pipework, return points and who owns the pumps, heat exchanger and dosing skid. | Required flow and available pressure by operating step, plus return line and control signals. |
| Compressed air | Header, isolation point, local valves and any dryer assigned to several areas. | Point-of-use pressure and quality requirement, plus measured peak demand during overlapping cycles. |
| Drainage | Floor channels, machine outlets and any connection to a neutralisation or treatment system. | Elevation, peak discharge and constraints the receiving facility must verify before connection. |
| Controls | External interlocks, remote recipe data and signals to shared plant services. | Who supplies the interface, which signals must be demonstrated and who owns the backups. |
Put an equipment reference next to every boundary on the drawing. A connector photograph complements that reference if it includes a location and direction. For a shared service, try to record the line’s use explicitly instead of assigning the capacity of an entire utility system to one line. Confirm units and note whether the value is normal operating demand or a peak.
Flag what has to be replaced at the destination
If the existing line relies on a central CIP unit serving three production rooms, write down the CIP sequence and the physical handover points. Also identify which recipes, valves and feedback signals are tied to the shared system. Ask for the receiving-site design estimate before accepting an equipment-only quotation.
Turn each building dependency in the worksheet into a delivery decision using the guide to plant assets and utilities, with a named owner for anything that stays in place.